Preliminary Investigation — Ammonia Vessel V-101 Overpressure

Responsible

Karim El Ouardi

Linked Event

EVT-2026-0008

Started

4/11/2026

Target Closure

5/11/2026

Incident Summary

On 10 April 2026 at 03:00, the pressure relief valve on ammonia storage vessel V-101 lifted following a process upset. The release was directed to the flare as designed. No personnel were present in the exclusion zone at the time. The process control team has identified a potential instrumentation failure as a contributing factor. A full root cause investigation has been initiated.

Linked Event
EVT-2026-0008

Critical: Overpressure event on ammonia vessel V-101

Incident · Ammonia Unit · 4/10/2026

View Event